SBA 504 Loan Calculator

An SBA 504 project is funded by two loans and a down payment rather than one note, so the monthly cost is the sum of a conventional bank first mortgage and a CDC debenture running beside it on a different rate and term. Enter the project cost, your injection, the two rates and the two terms and this returns each piece, both payments, the balloon on the bank note and a year by year schedule of both balances. A second action solves the debenture fees, which are financed inside the note and so make the debenture issued larger than the share of the project it funds, and gives the effective rate on the cash that actually reaches the project. The share split is programme structure and is modelled; every rate and fee percentage is an input, because the debenture rate is set at each monthly sale and the ongoing fees are reset by SBA each fiscal year. Use the quotes from your own CDC and bank rather than the defaults.

Calculator Type
Land, building, construction, long-lived equipment and the eligible soft costs together.
Fifty percent is the standard structure. Raise it when the debenture would otherwise breach its cap.
Negotiated with the bank, not set by SBA.
The schedule the bank payment is sized against.
Banks commonly amortise over 20 or 25 years and balloon at 5 or 10. Set this equal to the amortisation for a fully amortising note.
Fixed at the monthly debenture sale. Ask your CDC for the rate on the sale you would fund in.
Widget
The CDC share of the project, before any fees. The structure action gives this figure.
SOP caps this at 1.5 percent of net debenture proceeds. Some CDCs charge less.
Commonly 0.4 percent on a 20 or 25 year debenture and 0.375 percent on a 10 year one. Confirm the figure with your CDC.
Legal, title, appraisal and environmental work rolled into the debenture rather than paid in cash.
CDC servicing is at least 0.625 percent, the central servicing agent takes 0.10 percent, and the SBA ongoing guaranty fee is reset every fiscal year in a Federal Register notice. Add the three together and use the current figure.
Widget