Concrete Block Fill Calculator

This page estimates the grout for a concrete block wall from the wall itself rather than from a block count. Give the length and height in feet, the block width, how far apart the grouted cells are spaced and how many courses are bond beams, and it returns the volume in cubic feet and cubic yards, the number of 80 and 60 pound bags, and how many of the wall's cells are actually being filled. It handles a partially grouted wall, where only the cells holding reinforcement get filled, which is the case a solid-fill figure overstates badly. The void volumes match the core fill figures on the concrete block calculator, so a wall grouted solid gives the same answer on both pages. Openings are not deducted and nothing here sizes the reinforcement, so take the spacing from your drawings.

Units
The block module and the cell spacing both follow the choice.
Follow the spacing on your drawings. It is usually the reinforcing bar spacing, because a cell holding a bar is the cell that gets grouted. Each option is the same number of cells in either system.
Courses grouted solid right along the wall, usually one at the top and one over each opening.
Grout lost into head joints, spillage and the bottom of the mixer. Five to ten percent is normal.
Widget