Pole Barn Cost Calculator

A pole barn is post-frame construction, so the things that set its price are the number of posts, the number of trusses on the same spacing, and the steel panel area on the roof and walls. Give this the width, length, eave height, roof pitch and post spacing and it works all of that out, then applies a rate to each line to reach a total and a cost per square foot. Every rate is a box with a starting figure in it, meant to be replaced with the numbers on your own quote, and the concrete floor is a tick box because a great many barns are left on gravel. The quantities tab gives the same counts and areas with no money attached, for pricing a kit. It covers a plain gable barn with no lean-to, no second floor and no plumbing.

Calculator Type
Measurements In
Every length is read in feet, every small dimension in inches, every area rate in dollars per square foot and the concrete in cubic yards. The results come back the same way.

Every rate is a box you can change. The defaults are a starting point for a plain agricultural or storage barn; replace them with the figures on your own quote and the total follows. The area rates are read in dollars per square foot or per square metre, whichever the measurement choice is set to.

The gable end, the wall the roof peak runs to. This is the truss span. 8 to 200 ft, or 2.44 to 60.96 m.
The side walls, the direction the posts march along. 8 to 400 ft, or 2.44 to 121.92 m.
Ground to the bottom of the truss. Twelve feet clears most equipment; fourteen or sixteen if a lift or a camper has to go in. In metres that is about 3.7, and 4.3 to 4.9.
Rise per 12 of run, which is how a truss is ordered in every market. As an angle: 2 in 12 is 9.5 degrees, 3 in 12 is 14.0, 4 in 12 is 18.4, 5 in 12 is 22.6, 6 in 12 is 26.6, 8 in 12 is 33.7 and 12 in 12 is 45.
Wider spacing means fewer posts and fewer trusses but heavier girts and purlins between them. Eight feet is the common middle in feet; three metres is the common metric bay. 6 to 12 ft, or 1.83 to 3.66 m.
Up to 4 ft, or 1.22 m. Blank means 1 ft, or 0.3 m.
Up to 4 ft, or 1.22 m. Blank means 1 ft, or 0.3 m.
The column itself, the hole, the concrete footing at the bottom and the labour to plumb and brace it. A laminated column costs more than a solid treated post.
Scales with the span. A 30 ft truss runs a few hundred dollars; a 60 ft truss is several times that.
The horizontal lumber between the posts and across the trusses, the headers, the bracing and the labour to hang it all. Blank means $6.50 per sq ft, or $69.97 per sq m.
Steel panels, screws, underlayment, ridge cap and trim, fitted. Charged on the sloped area, which the tool works out. Blank means $4.50 per sq ft, or $48.44 per sq m.
Steel panels, corner and base trim, fitted. Charged on the wall area including the gable triangles. Blank means $4.00 per sq ft, or $43.06 per sq m.
Added to the roof and wall areas only, for overlaps, cuts around openings and the offcut at the end of a run.
Only used when the floor box above is ticked. Gravel base, vapour barrier, mesh or fibre, the pour and the finish. Blank means $7.00 per sq ft, or $75.35 per sq m.
Leave at zero for an open shell, which most barns are. Zero is zero in either unit, so this one box needs no conversion.
A sliding barn door is the cheap option; an insulated overhead door with an opener is several times the price.
Panel, the run from the house, lights and outlets. The trench to a barn out in a field is the line that surprises people.
Clearing, levelling and the gravel pad. A sloping site costs far more than a flat one.
Ten percent is the usual minimum. Ground that will not hold a post is the classic reason it gets spent.
Widget
Measurements In
Every length is read in feet, every small dimension in inches, every area rate in dollars per square foot and the concrete in cubic yards. The results come back the same way.

The counts and areas, with no money attached, for pricing a kit or checking a supplier list.

The gable end, the wall the roof peak runs to. This is the truss span. 8 to 200 ft, or 2.44 to 60.96 m.
The side walls, the direction the posts march along. 8 to 400 ft, or 2.44 to 121.92 m.
Ground to the bottom of the truss. Twelve feet clears most equipment; fourteen or sixteen if a lift or a camper has to go in. In metres that is about 3.7, and 4.3 to 4.9.
Rise per 12 of run, which is how a truss is ordered in every market. As an angle: 2 in 12 is 9.5 degrees, 3 in 12 is 14.0, 4 in 12 is 18.4, 5 in 12 is 22.6, 6 in 12 is 26.6, 8 in 12 is 33.7 and 12 in 12 is 45.
Wider spacing means fewer posts and fewer trusses but heavier girts and purlins between them. Eight feet is the common middle in feet; three metres is the common metric bay. 6 to 12 ft, or 1.83 to 3.66 m.
Up to 4 ft, or 1.22 m. Blank means 1 ft, or 0.3 m.
Up to 4 ft, or 1.22 m. Blank means 1 ft, or 0.3 m.
The width a panel covers once lapped, not the width of the sheet. Most agricultural steel covers 36 inches, which is what a blank box takes.
Enter 0 if there is no floor. Four inches suits storage, five or six if a tractor or a lift is going on it; in metric that is 100 mm, and 125 or 150 mm. Blank means 4 in, or 100 mm.