Rip Rap Calculator
Rip rap goes on a slope, and a slope is longer than the ground it covers, so ordering off the plan area comes up short. Give this the length of bank, the height of the face and the side slope and it works out the face area, the layer thickness from the 1.5 x D50 minimum, the volume, the tonnage, the bedding layer, the geotextile and the truck loads. A second action does the same for a trapezoidal ditch from its bottom width, depth and side slopes, and a third turns a tonnage you already have into the run of bank it will armour. Weight comes from the rock type and the voids in the placed layer rather than a single density, because dumped and hand-placed stone are not the same. It does not choose the stone size: D50 is a design decision and belongs on the drawing, so put in the one you were given.